S.E. BELL-LLOC 132/25 kV (Lleida)
S.E. BELL-LLOC 132/25 kV (LLEIDA) CAMI VINYES BELL-LLOC LOT 86
Civil works and electromechanical erection for the construction of a 132/25 kV outdoor substation with hybrid technology.
Client: Endesa
Technical Data:
- 132 kV switchyard: positions 2L+1T, simple busbar, 20 MVA transformer.
- 25 kV switchyard: 1 transformer, 2 lines, 1 coupling, 2 AS and 1 capacitor bank (4 MVAS)