S.E. BELL-LLOC 132/25 kV (LLEIDA) CAMI VINYES BELL-LLOC LOT 86

Civil works and electromechanical erection for the construction of a 132/25 kV outdoor substation with hybrid technology.

Client: Endesa

Technical Data

  • 132 kV switchyard: positions 2L+1T, simple busbar, 20 MVA transformer.
  • 25 kV switchyard: 1 transformer, 2 lines, 1 coupling, 2 AS and 1 capacitor bank (4 MVAS)