CRÊT D’EAU Tunnel (France)
This project involves the equipment for two tunnels (Crêt D’eau and La Follie) plus a junction on the Paris-Geneva line, in the French Alps. The total length of the project is 9.5 km with a double line powered with a rigid catenary at 25 kV for speeds up to 140 km/h. The rigid catenary is installed in a tunnel with a small open air section at the junction.
Client: SNCF
Technical Data:
Powered at 25 kV for the trains in the Paris-Geneva line at 140 km/hour.